服务热线
020-84061578
Horizontal spiral powder mixer
Manual Inkjet Printer in stock
This machine is for printing of sequence No., Batch No., shift NO., Date printing ect in food, chemical, pharmacy products. It’s easy to operate and useful, it can be used in different material and kind of shape object of bump on printing.
Item | HY-AIP |
Product Name | Manual Inkjet Printer in stock |
Material | 304 or 316 stainless steel as requirement |
Certificates | TUV ISO GMP |
Shipping | 3-7 days for Stock Equipment,15-30 days lead time for customized Equipment. By Sea or air freight etc. |
We havebeen engaged in Manual Inkjet Printer in Africa market for more than 10 years.
We are the professional factory and manufacturerof Chemical,
Pharmaceutical,Food Production line equipment service for all over the
world.
As customer known, Guangzhou Baiyun International Airport is very closed to our factory.
1 year warranty, technician available to service at any time.
Machine can be installed and debugged in our company before delivery.
We can assemble the line in your factory with all the cost on your
account or you can assemble the machine by yourself according to the
instruction and videos.
Lifelong after-sale service in techniques and one year warranty for
damage cause under proper use, if you need us to fix it in your country,
travel and accommodation cost will be on YOUR account.
Providing various kinds of liquid detergent, cosmetics, powder soap raw
chemicals materials for sale all over the world, deal with the problems
oflacking of raw chemicals material, Helping customers producing as soon
as possible.
1. How Can I get a detailed quotation from you?
A1: Just send us inquiry through this web page is ok. I will reply your any question within in 6 hours.
2. Where your factory are located in? How can I get there?
A2: Our factory are located in Huadu District, Guangzhou City, Guangdong
Province, China. It it 20 minutes from Baiyun International Airport by
taxi, you also can take metro line 3 to Qingbu station.
3. Why your machine similar with other supplier?
A3: We are manufacturer and had been in this industry for many years. We
design machines by ourselves with advanced technology. Appearance just a
part of machine,service and quality is more important than it.
4. What is the cost to send installation/training staff? How many staff do you need to send?
A4: Whole installation/training process needs 2peoples,Client needs to
provide us round-air ticket, visa fee, local transportation,
accommodation, food, and about 100USD/day/person.